Final surface work on the Burgoyne Bridge and the installation of supporting cables will begin next week.
As a result, traffic on St. Paul West at the Burgoyne Bridge will be reduced to one lane of traffic between McGuire Street and Henrietta Street starting Monday, November 14, 2016 until Friday, December 9, 2016.
McGuire Street will be closed to traffic during this period and Yates Street and Henrietta Street will remain closed.
Traffic during off-peak periods will be maintained using temporary traffic signals.
Pedestrian access will be maintained during this period.